East Berkshire College – full M&E installation in new build

 image 1  image 2  image 3
 main image

Click on the small image to change the main picture

Project type: Mechanical and electrical
Contract value: £2.6million
Contract period: 9 months
End client: East Berkshire Further Education Corporation
Our client: Kier

East Berkshire College was a large project to complete in a short space of time, involving work throughout an occupied education environment, with shut-down periods kept to a minimum and scheduled for holiday periods. It was a mix of existing and new build locations, including a sports hall and gym, reception and hospitality areas, classrooms, changing facilities, toilets and kitchens. BBS were instructed to design, build and install every M&E aspect of the college with the exception of the gas supply for the science labs. All staff were DBS checked.